CORE STRENGTHS CLIENT PORTAL PRICING ▶ DEMO GET STARTED → SWITCH TO APP →
SWITCH TO APP

Every TI build, documented from LOI to Certificate of Occupancy.

One live record from LOI to Certificate of Occupancy. Court Vision tracks the job and chases the ball for you, so every party does less work, with no new platform to manage. Accountability for every RFI and submittal, and a team that helps each other keep it moving.

BUILT FOR LANDLORDS & PROJECT MANAGERSEASY FOR ARCHITECTS, ENGINEERS & GCS

Court Vision connecting every stakeholder on a tenant improvement build
LOI TO CERTIFICATE OF OCCUPANCY// RFIS & SUBMITTALS// WHO HOLDS THE BALL — AND FOR HOW LONG// AUTOMATIC COURT VISION TRACKING// PERMIT WATCH & INSPECTIONS// LESS WORK FOR EVERY PARTY// LOI TO CERTIFICATE OF OCCUPANCY// RFIS & SUBMITTALS// WHO HOLDS THE BALL — AND FOR HOW LONG// AUTOMATIC COURT VISION TRACKING// PERMIT WATCH & INSPECTIONS// LESS WORK FOR EVERY PARTY// LOI TO CERTIFICATE OF OCCUPANCY// RFIS & SUBMITTALS// WHO HOLDS THE BALL — AND FOR HOW LONG// AUTOMATIC COURT VISION TRACKING// PERMIT WATCH & INSPECTIONS// LESS WORK FOR EVERY PARTY// LOI TO CERTIFICATE OF OCCUPANCY// RFIS & SUBMITTALS// WHO HOLDS THE BALL — AND FOR HOW LONG// AUTOMATIC COURT VISION TRACKING// PERMIT WATCH & INSPECTIONS// LESS WORK FOR EVERY PARTY//
Live Court Vision project

Base contract executed.

Commercial asset · Orlando · Construction start: June 2026

——
days to commencement
Rent commencement

January 26, 2027

The date the lease starts charging. Every 15 days past it credits $38,634.92 of free rent.

—
hours
—
min
—
sec
—
days left
On track for delivery
Total build out
$2,898,796.99
Per square foot
$93.2131,100 sq ft
Submittals cleared
105-day clear time
Permit
IssuedSep 16 · ball to the contractor
What the clock is worth

Rent commencement is set for Jan 26, 2027. Every 15 days the landlord is late credits the tenant roughly $38,634.92 in free rent — four of those blocks puts 60 days at $154,540. That is what a stalled permit costs, and it is why the ball is never allowed to sit.

4  dropped balls caught before they hit the schedule

SaveElectrical. Flagged for shared neutral conductor sizing on E1-201 — harmonics compliance not shown. Corrected and resubmitted; review passed.
SaveFire. Denied on two findings, including fire extinguisher travel distance. Corrected and resubmitted; review passed.
StealPlan review. Denied twice across two review cycles — resubmitted 8/10 answering the plan examiner's objection comments, then kicked back again and held 9 days with the ball still in the examiner's court. Caught and pushed back for reapproval before the clock ran; building review cleared its second cycle and the permit was approved. The permit landed 26 days past its review target — every day of it in plan review, before a single day of construction.
SaveEng/Zone and Impact Fees. Both cleared the same week the others were denied — two lanes closed for good, so neither can block this build again.

Rent does not start when the work finishes. It starts on the date the lease says the space will be delivered — and past that date the tenant is credited free rent in fixed blocks. Every block is money the building was supposed to earn and does not.

15 days late
$38,634.92
30 days late
$77,270
45 days late
$115,905
60 days late
$154,540

Not modelled. These are the terms of the executed lease on this build — $38,634.92 credited for every 15 days past commencement, which is set for Jan 26, 2027. The lease also works its own example at sixty days, near $150,733 — but on an older, lower base rent. At the rent actually in force the four-block figure is $154,540.

Which way it was running

Two reviews sat denied and unmoving — 26 days held on plumbing, 8 on electrical. Held days are what become credited blocks if they are still there at delivery.

Which way it runs now

Both went back in on Aug 31, so those clocks stopped. The 4 catches above are days that never became held days at all — and every block not slipped is $38,634.92 that stays with the building.

Sky — the AI that runs the record — pings the stakeholder whose court the ball is on, before the delay happens, not after.

CORE STRENGTHS

Court Vision, in the simplest terms: it keeps the record so nobody has to chase it. Each person sees only what is in their court, Sky reads the project mail and does the follow-up, and the job moves from LOI to C.O. with less work for every party — not one more platform to manage.

LOI TO CERTIFICATE OF OCCUPANCY

One workflow for the whole TI build. Twelve stages are already mapped, from the signed LOI to the Certificate of Occupancy, and every approval and change order is logged as it happens.

RFIS & SUBMITTALS

Every RFI and submittal shows who holds the ball and for how long. Each one is logged the moment it goes out, timestamped against the stakeholder who owns it, and its clear time recorded — so a slow review is a number, not a feeling.

AUTOMATIC COURT VISION TRACKING

The job tracks itself. A possession clock runs on every open item, permits are checked every 3 hours, inspections are followed through to a pass, and every stakeholder has a live board of what is in their court.

LESS WORK FOR EVERY PARTY

Not another platform to manage. Sky reads the project mail, logs what moved, and emails whoever holds the ball until it moves. The architect and engineer get a morning briefing; owners and landlords get a plain-language update — nobody has to chase status.

WHO HOLDS THE BALL
LIVE BUILD
ITEM · IN WHOSE COURTWHERE IT STANDS
SUBMITTAL
HVAC controls
Engineer
ApprovedAUG 31
PLAN REVIEW
Building review, 2nd cycle
Plan examiner
9 daysHELD · CLEARED SEP 12
PERMIT
Building, mechanical & electrical
Ball to the contractor
IssuedSEP 16
INSPECTION
Framing
Inspector
PassedSEP 28
10 submittals cleared · 5-day clear timeFrom the live build above
BUILT FOR LANDLORDS PROJECT MANAGERS
EASY FOR ARCHITECTS ENGINEERS GCS
HOW COURT VISION RUNS YOUR JOBAlmost no manual input. Sky reads the mail and keeps the clock.
  1. A clock on every item. It runs against the turnaround each firm agreed to. Past it, the item reads “3 Days Past Due” with the firm’s name on it.
  2. Issued, then Received. Each firm ticks Issued, then Received, and every tick records who and when. “Not received” sends it straight back to the sender.
  3. Closed only on proof. Sky reads the project mail and closes an item only when an email clearly settles it. Anything uncertain waits for your OK.
  4. One plain sentence. Nothing goes to anyone unless the ask is one plain sentence.
  5. No inbox flood. Your architect and engineer get one weekday-morning email with only their items. Your GC is nudged only when something is more than 5 days past due.
  6. One board. Permits and inspections sit on the same board as the RFIs and submittals.
  7. Nothing to install. Each stakeholder’s personal link is their login. No password, no app.

This was not built by software people studying construction. It was built by the project manager and owner’s representative running the build shown above — delivering tenant improvement projects since 2008, across NYC (Manhattan, Bx, Queens) and Orlando, where a missed delivery date is not a scheduling inconvenience but a line on somebody’s rent roll.

2008
Running TI build-outs since
40+
Projects delivered
13M
Sq ft of commercial space managed
PM
and owner’s rep — the seat that carries the date

Some of the Tenant Improvement Projects completed:

Chipotle
AT&T
Verizon
Spectrum
Planet Fitness
Pure Barre
IHOP
7-Eleven
Rainbow
Temenos
Pret A Manger
Tmrw sports

Which is why this page shows a real job rather than a case study. The denied electrical review, the 34 days two permit reviews sat unmoving — 26 on plumbing, 8 on electrical — the credited rent blocks: that is a live lease on a live project, this week. Every feature here exists because something on a jobsite went wrong first, and because someone with the scar tissue to recognise it stayed on the phone until it moved. That is what built this — the experience to see the slip coming, and the grit to chase it down.

ACCOUNTABILITY PLATFORM

PROJECT TRACKER DASHBOARD

Track every project from Tenant Improvement Build Out, Capital Project, or Building Improvement — from concept to completion. The only accountability platform that is automated, has an AI agent as your accountability referee, and gives you a real-time visual so you always KNOW WHOSE COURT THE BALL IS ON.

COURT VISION — PROJECT TRACKER

From concept to completion — Tenant Build Outs, Capital and Building Improvements

TENANT BUILD OUT

TAP ANY STAGE TO SEE WHAT HAPPENS  ·  ⚡ = STEAL / BLOCK RISK

Court Vision
REAL-TIME INTELLIGENCE

YOUR TI PROJECT DASHBOARD

Built for one kind of job: the Tenant Improvement build-out. Every approval, submittal and inspection has an owner and a clock — so the days that turn into free-rent credits get caught while they are still just days.

4
DROPPED BALLS CAUGHT
before they hit the schedule
34
HELD DAYS SURFACED
plumbing 26 · electrical 8
5-day
SUBMITTAL CLEAR TIME
10 submittals cleared
$38.6k
FREE RENT PER 15 DAYS LATE
what one slipped block credits

Figures above are from the live Court Vision build at the top of this page. Charts below model a typical TI build-out.

PM HOURS/WEEK CHASING STATUS — BY BUILD PHASE
CHASING BY HAND (HRS)
WITH COURT VISION (HRS)
WHERE THE CHASING GOES ON A TI BUILD (HRS/WEEK)
YOUR TEAM, BY HAND (HRS)
SKY TAKES OVER (HRS)
WHERE TI SCHEDULES SLIP
PERMITS & PLAN REVIEW 40%
SUBMITTALS & RFIS 25%
LANDLORD / OWNER APPROVALS 20%
INSPECTIONS 15%
HELD DAYS PILING UP — UNTRACKED VS. COURT VISION
UNTRACKED (CUMULATIVE DAYS)
COURT VISION (CUMULATIVE DAYS)
BUILT FOR TI, NOT GENERIC PM
LOI to Certificate of Occupancy is already mapped — twelve stages and every stakeholder in place. No setup project before the project.
ONE THREAD FOR EVERY STAKEHOLDER
GC, architect, engineer, landlord and tenant read the same record. Nobody asks for a status update that is already posted.
SKY WATCHES THE CLOCK
Sky knows whose court the ball is in and how long it has sat there — and pings them before a held day becomes a credited one.
TENANT IMPROVEMENT

AUTOMATION WORKFLOW

From executed lease to Certificate of Occupancy — every document, approval and inspection routed to whoever holds the ball.

WHAT COMES IN
📋
LEASE & LOI
📐
PLANS & SPECS
📨
SUBMITTALS & RFIS
🏛️
PERMIT PORTAL
📷
FIELD PHOTOS
PROJECT HUB
Project Hub
PROJECT HUB
COURT VISION ENGINE
⏱️
POSSESSION CLOCK
🔎
INTELLIGENT PERMIT TRACKING
🔔
STAKEHOLDER ALERTS
🗂️
SUBMITTAL LOG
✍️
E-SIGNATURE
SKY BOT
PERSONAL AI
ASSISTANT
OUTPUTS
📅
RCD COUNTDOWN
📊
OWNER BRIEFING
🦺
INSPECTIONS
🧾
AUDIT TRAIL
🎬
CLOSEOUT FILM
HOVER NODES TO EXPLORE CONNECTIONS
What Comes In
LSE
Lease & LOI
PLN
Plans
RFI
Submittals
PMT
Permit Portal
PIC
Field Photos
Project Hub
Project Hub
Court Vision Engine
CLK
Possession Clock
IPT
Intelligent Permit Tracking
!
Alerts
SUB
Submittal Log
SIG
E-Signature
Outputs
RCD
RCD Countdown
BRF
Owner Briefing
✓
Inspections
LOG
Audit Trail
FLM
Closeout Film
$ TI ROI CALCULATOR

WHAT IS A SLIPPED TI BUILD
COSTING YOUR PROJECT?

Set it to your own tenant build-outs. Two costs come out: the hours your team spends chasing status, and the free rent a late delivery credits.

TI PROJECTS RUNNING AT ONCE
HOURS/WEEK CHASING STATUS, PER PROJECT 8 HRS
1 HRS30 HRS
TEAM HOURLY RATE $75/HR
$25/HR$250/HR
FREE RENT CREDITED PER 15 DAYS LATE $15K
$2.5K$60K
DAYS A BUILD SLIPS PAST COMMENCEMENT 30 DAYS
0 DAYS90 DAYS
COST AVOIDED PER YEAR FROM ONE CAUGHT RISK $12K
$0$40K
YOUR REAL-TIME RESULTS
Status chasing costs you per month:
$2.6k/month
Court Vision gives your team back:
6 HRS/week
Free rent that slip credits, per project:
$30.0k
Risk avoided per year, caught before it became a delay:
$1.0k/month
WHAT'S ON THE LINE
What chasing costs each month, what the hours Court Vision gives back are worth, and the free rent one slip credits across your active builds.
Monthly cost of chasing status by hand
Monthly value of the hours Court Vision gives back
Free rent credited by that slip, all active builds
Risk avoided per year, caught before it hit the schedule
BOTTOM LINE
Assumes Sky takes over about 70% of status chasing. Free rent is credited in whole 15-day blocks, so only full blocks are counted. Use the credit written in your own lease.

WANT TO SEE IT WORK?
RIGHT NOW.

Let's walk you through one Court Vision build in three parts —
the tracker, the automation behind it, and the film it ends with. Live.

▶ SEE IT WORK — 60 SECONDS →
ONE COURT VISION DEMO · THREE PARTS
01
COURT VISION

A tenant build moves from LOI to Certificate of Occupancy — stage by stage, player by player, with Sky calling every steal before it costs a day.

02
AUTOMATION

The same build, behind the board. Lease terms, plans, RFIs, submittals and permits come in, and Court Vision routes each one to whoever holds the ball.

03
CLOSEOUT FILM

Photos are taken at every phase of work. At closeout they are cut into one film that showcases the finished construction and the players who built it.

Priced Per Project

EVERYTHING IT TAKES TO SET UP THE JOB AND SEE IT THROUGH TO CERTIFICATE OF OCCUPANCY

COURT VISION
Priced per project

One tenant build. One fee. Every stakeholder, every approval and every inspection tracked until the doors open.

  • ✓One fee, set at signing — change orders don't move it
  • ✓Runs through your rent commencement date
  • ✓Pay at signing, or monthly across the term
BOOK A 15-MINUTE TI STRATEGY CALL
01SET UP THE JOB
  • ✓Project board built from your lease terms, schedule and plan set
  • ✓Rent commencement date and lease credit terms loaded as the clock
  • ✓Stakeholder portals for the GC, architect, engineer, PM and landlord
  • ✓Every stakeholder signed on by e-signature
  • ✓Plans, specs and submittals filed in the project vault
  • ✓Dedicated strategy and onboarding
02RUN THE BUILD
  • ✓Every stage tracked from LOI to Certificate of Occupancy
  • ✓Possession clock on every open item
  • ✓Intelligent Permit Tracking System — every permit checked every 3 hours, so no one tracks them by hand
  • ✓Sky alerts whoever holds the ball and calls out what's late
  • ✓Submittal and RFI log with clear times
  • ✓Owner and landlord briefings
03COMPLETE IT
  • ✓Inspections tracked through to a pass
  • ✓Punch list through Certificate of Occupancy
  • ✓Field photos tagged to every phase of work
  • ✓Full audit trail — who was told what, and when
  • ✓Cinematic closeout film of the finished build and its players
Contact Support
Skyrise Pro is here to help. We'll get back to you within 1 business day.
Prefer to talk? Call us at (689) 220-3491
✅
Your request has been received.
We'll follow up at your email within 1 business day.
CLIENT PORTAL
SKY
CLICK TO TALK
HEY, I'M SKY
● ONLINE — AI AGENT
How would you like to connect?
SKY
● ONLINE — AI AGENT
Hi, I'm Sky. I keep the record on Skyrisepro's tenant improvement builds — every RFI and submittal, who holds the ball and for how long, and the whole job tracked on the Court Vision board from LOI to Certificate of Occupancy. What's your role on the build — landlord, project manager, architect, engineer or GC?
CHAT WITH SKY